Skip navigation to main content. National Renewable Energy Laboratory (NREL)NREL HomeInnovation for Our Energy Future
About NRELScience and TechnologyTechnology TransferApplying TechnologiesLearning About Renewables
Wind Research
Wind Research Home Capabilities Projects Low Wind Speed Technology Advanced Component Technology Mid-Size Wind Turbine Research Small Wind Turbine Research Small Wind Turbine Independent Testing Regional Test Centers Small Wind Turbine Development Field Verification Project Regional Field Verification Information and Outreach Utility Grid Integration Environmental Issues Facilities Research Staff Working with Us Publications Awards News

Mariah Power

A video of Mariah Power's Windspire wind turbine.
Text Version

As part of the National Renewable Energy Laboratory and U.S. Department of Energy (NREL/DOE) Independent Testing project, NREL was testing Mariah Power's Windspire Giromill small wind turbine at the National Wind Technology Center (NWTC) through January 14, 2009 when NREL terminated its testing. Read a chronology of events and letter from Mariah Power to NREL (PDF 817 KB) Download Adobe Reader.

The Windspire is a 1.2-kW vertical-axis small wind turbine. The turbine tower is 9.1 meters tall, and its rotor area is 1.2 x 6.1 meters. The turbine has a permanent-magnet generator with a single-phase output at 120 volts AC.

Testing Progress

The date of the information in this progress report is January 30, 2009. Supporting data and explanations for data provided in this table will be provided in the final reports. Data presented are preliminary and subject to revision.

Cumulative Energy Production

5/31/2008: 32; 6/23/2008: 68; 7/28/2008: 88; 8/22/2008: 98; 9/11/2008: 108; 10/8/2008: 118; 11/12/2008: 138;
Activity Status
Award of Subcontract February 5, 2008
Preparation for Installation Foundation poured: February 21, 2008
Components received: March 7, 2008
Inverter received: May 2, 2008
Documentation received: May 8, 2008
Turbine Installation Turbine Installed: March 17, 2008
Inverter Installed: May 5, 2008
Turbine Commissioning May 15, 2008
Turbine O&M and Testing  
Safety and Function Testing terminated 1/14/09
Power Performance Testing terminated 1/14/09
Hrs of valid data (60 required)
299
Bins completed (3-14 m/s required)
0.5 - 13.5
Acoustic Noise Testing terminated 1/14/09
Power Quality N/A
Duration Test Testing terminated 10/14/08
Months of operation (6 required)
4.8
Hours of power production (2,500 required)
831.3
Hours of power production in winds above 7.2 m/s (250 required)
132.9
Hours of power production in winds above 10.8 m/s (25 required)
12.5
KWH of production, cumulative
108
Post-test Inspection Not started
Final Documentation Not started
Project Review Meeting Not started